Commercial & Industrial Water Connection Fees

Tap Fees:
5/8″ & 3/4″ meters: $1,490.00¹
1″ meter: $1,475.00¹
1.5″ or larger meters: Cost of Materials, Labor and Equipment to install²

(1) In those instances where the cost of the installation exceeds the published tap or set fee due to rock, the property owner will be charged the actual cost of the Materials, Labor, and Equipment to make the tap or set.

(2) All work will have an estimated cost prepared.  Estimates will be prepaid by the property owner.

Water System Development Charges:
The amount of the Water System Development Charge may be determined by the schedule set below:

Meter Size (inches) Safe Maximum Operating Capacity of Water Meter (gpm) Water System Development Charge
5/8 25 $223
1 70 $623
1.5 120 $1,073
2 170 $1,520
3 390 $3,487
4 715 $6,394

All new irrigation system meters will be assessed a Water System Development Charge at one-half the rate of the above schedule. Where there is a new water service or increase in water meter size, then a Water System Development Charge will be assessed according to the above schedule less credit for previous charges to the property or properties included in the new development.  Credit for previous Water System Development Charges is not transferable and will always remain with the property.

(Effective January 1, 2023)